The children in Year 2 and Year 3 will be making vehicles in design technology after half term. We have prepared packs of materials and instruction booklets so that 5 lessons of work can take place at home, should the lockdown continue after 8 March. If we do return to school by then, there are two sessions that they children should complete, called ‘Build the chassis’ and ‘Build the bucket and arm mechanism’.
The packs can be collected from school on Monday 8 February or Monday 22 February (after half term). A video of instructions will also be available on the school website from Monday 8 February.
If you are in school, you do not need to collect a pack, as we will be completing this work in class time.